Tatch · 03 / 07 · Routes

Routes that plan themselves.

AI builds each day’s route by priority, geography, and relationship stage — with turn-by-turn navigation to every stop.

Built overnightTurn-by-turnStage-aware
TODAY · 01 Hartwell → 02 Summit → 03 Riverside → 04 Oakline
built overnight · turn-by-turn to every stop

Stop to stop, drawn before you wake.

Overnight, the day’s stops arrange themselves into one line on the map — priority first, geography tightest, relationship cadence respected. Turn-by-turn runs the line door to door.

01 · Hartwell · 09:1002 · Summit · 10:4003 · Riverside · 13:2004 · Oakline · 15:00
TODAY · 4 stops · 18 mi · built overnight
turn-by-turn → every stop

How a route builds itself.

Three signals go in; one ordered day comes out. Priority pulls overdue accounts forward, geography clusters the miles away, and relationship stage sets each account’s cadence.

PRIORITY4 overdue → front of the day
GEOGRAPHYstops cluster · miles drop
STAGEactive → every 3 weeks
THE ROUTE01 → 02 → 03 → 04 · in the order that wins

Route to route.

Today’s check-ins feed tomorrow’s plan: a closed task drops off, a new lead pulls a stop in, an overdue account climbs the order. By the time the truck is parked, tomorrow’s route is already drawn.

today’s routecheck-ins landtomorrow · ready
the loop runs every night

Briefed as you drive.

Before every door, a voice brief plays on the way: what happened last visit, what’s open, what to walk in knowing. No scrolling in the parking lot.

MORNING BRIEF — HARTWELL PLUMBING
› Last visit 34 days ago — you spoke with Dana.
› Two jobs sent since, both closed.
› Opener: the water-heater lead from June.

One system for turning relationships into revenue.

Join the waitlist

TatchConnect ships this summer, with the full Tatch platform close behind.